Change order of posts ⭥

The list of posts is divided into three sections, which represent the three different areas of the screen: the main area, the sidebar and the footer. 

To the left of the title for each post, you find a symbol with six dots   . You can place the mouse-arrow over this symbol, left-click and pull the post up or down. You can change the order of the posts this way, and you can change the area of the screen that the post is displayed on.